Early detection is the difference between scheduled maintenance and a catastrophic failure caused by accelerated corrosion. In corridors where electrical infrastructure and fluid-transport pipelines converge, electromagnetic interference (EMI) diagnostics must be rigorous and systematic.
Many engineers rely solely on rectifier potential readings, overlooking the fact that alternating current (AC) interference can damage the coating even when cathodic protection levels appear “within compliance.” To support this evaluation, we have consolidated the critical checkpoints our TECNA ICE experts assess in every interference-mitigation engineering project.
Download the Technical Checklist
This Excel checklist includes 20 key questions across 4 critical areas—a technical roadmap to evaluate the vulnerability of your assets. The document is designed to support decision-making in maintenance, engineering, and integrity teams; however, it does not replace professional judgment or a specialized interference-mitigation assessment.
The document is designed to support decision-making in maintenance, engineering, or integrity teams, but it does not replace professional judgment or a specialist assessment conducted by interference-mitigation experts.
Completing this checklist is only the first step. If your asset meets more than three warning indicators, it likely requires a formal AC/DC Interference Mitigation Design. At TECNA ICE, we go beyond diagnostics: we deliver detailed engineering, supply state-of-the-art components, and perform field installation under international standards.
Do not allow silent induction to compromise your integrity objectives. A timely AC/DC Interference Assessment is the most cost-effective investment for the lifetime of your pipeline.
It allows the centralization and codification of the information related to the integrity of the Asset: The necessary nomenclatures are defined in order to identify each document according to its origin. Likewise, each document can be classified in relation to the process in which it is involved. It allows organizing documents by means of a hierarchical tree that enables searches and filters to quickly find documents.
Allows the evaluation and control of modifications to the design of facilities, operation, organization or activities; prior to implementation, in order to ensure that no new elements will be introduced that increase the risk and existing hazards to the business, people or the environment based on applicable regulations.
Assesses and analyzes the risk level of the Assets to generate an inspection plan. It is designed to perform the calculation and analysis of static equipment risk under the RP API 581-16 standard. The user will be able to create the required risk assessments
to generate a valuation and inspection plan.
It allows the centralization and codification of the information related to the integrity of the Asset: The necessary nomenclatures are defined in order to identify each document according to its origin. Likewise, each document can be classified in relation to the process in which it is involved. It allows organizing documents by means of a hierarchical tree that enables searches and filters to quickly find documents.