Commissioning

☑️
Technical Commissioning
📊
Data Certification
🚀
Operational Delivery

Ensure that your cathodic protection system operates at peak efficiency from the very first second. At TECNA ICE, we follow rigorous pre-commissioning and commissioning protocols to validate the electrical integrity and compliance with protection criteria for your buried or submerged assets.

Description

Performance Guarantee: A constructed system is not the same as an operational system. The TECNA ICE Commissioning process bridges the gap between civil and electrical construction and the actual electrochemical protection of the steel.

Service Description

The Cathodic Protection System Commissioning service is the critical phase in which TECNA ICE certifies that every component of the system—from the anode beds to the rectifier units—interacts correctly to halt the corrosion process. This process is divided into two fundamental stages: Pre-commissioning, during which we verify electrical continuity, the absence of shorts, and the physical integrity of the connections while the system is de-energized; and Commissioning, during which we energize the system, adjust the currents, and measure the protection potentials to ensure compliance with regulatory criteria (such as the -850 mV criterion or the 100 mV polarization criterion) established by NACE/AMPP.

Pre-commissioning

  • Continuity testing of cables and connections.
  • Leak tests on monoblock joints and flanges.
  • Inspection of the contact resistance of anode beds.
  • Checklist for Compliance with Technical Specifications.

Commissioning

  • Start-up and Calibration of Rectifiers.
  • Measurement of ON/OFF potentials along the pipeline.
  • Current Balancing in Complex Systems.
  • Issuance of handover protocols and final reports.

Specialized Supervision

TECNA ICE’s commissioning protocols are designed to detect imperceptible anomalies during construction. A poorly commissioned system can result in underprotection (active corrosion) or overprotection (damage to the coating). Our methodology ensures that initial operating parameters are documented in a comprehensive technical dossier, serving as a baseline for future maintenance. Whether for impressed current systems in gas pipelines or galvanic systems in tanks, we provide the technical assurance that your infrastructure is fully protected in accordance with international standards.

Commissioning Deliverables

 

Protocols

Test formats signed and validated by the engineering department.

 

Baseline

Initial data for integrity monitoring.

 

Certification

Technical certification confirming that the system complies with NACE SP0169.

 

Training

Technical training for your plant operators.